This page can't be edited.

Red Pitaya - preliminary work

From $1

    Table of contents
    You are currently comparing two old versions - only when you are comparing against the latest version can you revert. Return to version archive.

    Combined revision comparison

    Comparing version 19:44, 3 Aug 2018 by Admin with version 19:47, 3 Aug 2018 by Admin.

    ...

    Two of these boards have been deployed in the field:

    • one on a Bridgemaster E 25 kW with 8' open array antenna, at the FORCE visitor centre (since Nov., 2014)
    • one on a Furuno FR8252 with 6' open array antenna, at the Cape Sharp Lighthouse (since May, 2018)

    ...

    Version from 19:44, 3 Aug 2018

    This revision modified by Admin (Ban)

    ...

    Version as of 19:47, 3 Aug 2018

    This revision modified by Admin (Ban)

    ...

    Two of these boards have been deployed in the field:

    • one on a Bridgemaster E 25 kW with 8' open array antenna, at the FORCE visitor centre (since Nov., 2014)
    • one on a Furuno FR8252 with 6' open array antenna, at the Cape Sharp Lighthouse (since May, 2018)

    ...


     
    Powered by MindTouch Core